> For the complete documentation index, see [llms.txt](https://learn.tryonederful.com/llms.txt). Markdown versions of documentation pages are available by appending `.md` to page URLs; this page is available as [Markdown](https://learn.tryonederful.com/asc-842/schedule-calculation-for-multiple-assets.md).

# Schedule Calculation for Multiple Assets

A lease contract can be associated with either a single asset or multiple assets.

For example, a contract may cover several leased vehicles, equipment items, or other lease objects. In such cases, users can either:

* Manage all leased assets under a single lease schedule and a single ROU Asset.
* Create a separate lease schedule for each leased asset.

To simplify the creation of multiple schedules, the system provides the **Clone Schedule** function.

Instead of manually creating identical schedules for multiple lease assets, users can create one schedule and generate additional copies automatically.

#### Prerequisites

Before using the Clone Schedule function:

* At least one lease schedule must already exist.
* The schedule must be activated.
* The schedule must have:
  * **Schedule Status = Active**
  * **Version Status = Valid**

#### Creating Multiple Schedule Copies

To create additional schedules:

1. Open the active lease schedule.
2. Select **Clone Schedule**.
3. Specify the number of schedules to create.
4. Confirm the action.

<figure><img src="https://2293621423-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FNiU1fCfJHkxl4dGv4MCm%2Fuploads%2FOUm6BW8tthI16lHUyjTw%2Fimage.png?alt=media&amp;token=c0b48636-342c-4534-92ae-f29ea0bf318a" alt=""><figcaption></figcaption></figure>

<figure><img src="https://2293621423-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FNiU1fCfJHkxl4dGv4MCm%2Fuploads%2F1j66EEtR27PeKn7jrc3K%2Fimage.png?alt=media&amp;token=ea6c92b1-712d-4b3e-b431-8a21898202c8" alt=""><figcaption></figcaption></figure>

#### Result

The system creates additional lease schedules based on the original schedule.

All copied schedules inherit the same schedule structure and calculation parameters as the source schedule. Users can then review and update individual schedule details if necessary.

<figure><img src="https://2293621423-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FNiU1fCfJHkxl4dGv4MCm%2Fuploads%2FuWFM86S9I8mShFPgOIOr%2Fimage.png?alt=media&amp;token=91efcb08-6496-4aa3-8760-28e7d1c215ab" alt=""><figcaption></figcaption></figure>
